Posts: 13
Threads: 7
Joined: Jun 2017
Reputation:
0
Need to add repair/adjust city electrical panel. There is a short between Inside and Industry power in some settings.
Issue was isolated to that panel, but never repaired.
Posts: 13
Threads: 7
Joined: Jun 2017
Reputation:
0
This attached file has my notes from Mike on electrical tools. I have added what I remember of the standards Mike used for the layout wiring.
This may be used as the starting point for the electrical standards.
Posts: 10
Threads: 3
Joined: Jun 2017
Reputation:
0
Thomas,
Thanks for your input for the electrical standards, good stuff!
I would like to know when we get the short so we can try to determine how to fix it. Switch positions, etc. I never noticed a problem there myself.
Rex
Posts: 13
Threads: 7
Joined: Jun 2017
Reputation:
0
Not actually a short, but if you disconnect the industry booster, you still get power from Inside unless you isolate the City panel.
So we are using 3 boosters, not four.
My wife has us doing something for my birthday today.
See you Tuesday.
Posts: 10
Threads: 3
Joined: Jun 2017
Reputation:
0
Interesting! We can look at it Tuesday. Is it possible the inside track and industry tracks have a metal rail joiner were an insulated joiner is required?
Posts: 13
Threads: 7
Joined: Jun 2017
Reputation:
0
Is this the way to submit project proposals?
Attached is the completed form.
Posts: 10
Threads: 3
Joined: Jun 2017
Reputation:
0
The Layout Management Team will consider the project and provide our recommendations / response.