Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Layout Mgmt Team Worksheet/Status Updates
#1
The Layout Management Team maintains a web based worksheet available to all members to view the progress and status updates of work done and/or directed by the Team.

Link to worksheet: https://tinyurl.com/y95ggz25
Reply
#2
Need to add repair/adjust city electrical panel. There is a short between Inside and Industry power in some settings.
Issue was isolated to that panel, but never repaired.
Reply
#3
This attached file has my notes from Mike on electrical tools. I have added what I remember of the standards Mike used for the layout wiring.
This may be used as the starting point for the electrical standards.
Reply
#4
Thomas,

Thanks for your input for the electrical standards, good stuff!

I would like to know when we get the short so we can try to determine how to fix it. Switch positions, etc. I never noticed a problem there myself.

Rex
Reply
#5
Not actually a short, but if you disconnect the industry booster, you still get power from Inside unless you isolate the City panel.
So we are using 3 boosters, not four.
My wife has us doing something for my birthday today.
See you Tuesday.
Reply
#6
Interesting! We can look at it Tuesday. Is it possible the inside track and industry tracks have a metal rail joiner were an insulated joiner is required?
Reply
#7
Is this the way to submit project proposals?
Attached is the completed form.
Reply
#8
The Layout Management Team will consider the project and provide our recommendations / response.
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)